Skip to content
CleanEarth Energy
Leading Solar Power & Wind Turbines Providers | Cleanearth Energy
CleanEarth EnergyCleanEarth Energy
  • Home
  • Wind
    • Existing Permissions
    • Wind FAQs
  • Solar
    • Solar FAQs
  • Services
    • Asset Management
    • Operations & Maintenance
    • Electrical Contracting
    • ALoMC Programme
  • Our Projects
    • Projects Map
    • Case Studies
    • Public Consultations
  • News
  • About
    • Our Ethos
    • Careers
  • Contact
  • Home
  • Wind
    • Existing Permissions
    • Wind FAQs
  • Solar
    • Solar FAQs
  • Services
    • Asset Management
    • Operations & Maintenance
    • Electrical Contracting
    • ALoMC Programme
  • Our Projects
    • Projects Map
    • Case Studies
    • Public Consultations
  • News
  • About
    • Our Ethos
    • Careers
  • Contact

Category Archives: Wind

South West’s most productive wind turbine gets the go-ahead

Cornwall, WindBy CleanEarth Energy18th March 2021

CleanEarth have secured planning consent for a 4.1 MW wind turbine, with a tip height of 135m – to be erected within the Clay Area, in Cornwall – a landscape characterised by the effects of china clay extraction. The success of this project is due to years of focused effort – in overcoming aviation concerns,…

Planning consent received for four new turbines in Scotland

Scotland, WindBy CleanEarth Energy25th January 2021

Despite the prevailing chaos in the world, 2021 has started well for CleanEarth, with projects for four wind turbines receiving planning permission. When commissioned, these turbines will add to our ever-increasing Scottish portfolio, which is forecast to generate in excess of 200 GWh per year by 2025. This is already making a significant contribution to…

Magor wind turbine – video

Wales, WindBy CleanEarth Energy21st December 2020

 This two minute video shows some of the work that went into installing the Magor Brewery wind turbine, which is now providing low-cost, low-carbon electricity directly into Budweiser Brewing Group in South Wales.

CleanEarth wind turbine now powering Budweiser Brewing Group

Renewables, Wales, WindBy CleanEarth Energy17th December 2020

Our latest turbine installation went live in South Wales today, and is now providing renewable energy directly to Budweiser Brewing Group’s brewery in Magor. This is our largest wind project to date, equipped with turbine blades that – at 68 metres – we believe are the longest ever to enter commercial operation on UK soil.…

CleanEarth takes delivery of UK’s longest onshore wind turbine blades (video)

WindBy CleanEarth Energy9th December 2020

 This week saw the arrival of the longest turbine blades to go into commercial operation on UK soil. At 68 metres long the swept area of these blades will be the equivalent of two Wembley football pitches, and the total height of the finished turbine will be fully 150m (just under 500 feet). Long…

Afton Lea wind turbine, Strathaven

Finishing what others started: two turbines acquired and energised in Scotland

News, Scotland, WindBy CleanEarth Energy6th May 2020

When the Burnbrae and Afton Lea turbines were erected in 2016, it should have meant another two megawatts being added to the UK’s renewable generating capacity. Four years on, they’d barely done enough to boil a kettle. But CleanEarth recently acquired them, and last week we got them spinning and finally sending power to the…

ENERGY INSIGHTS – Winter 2020

Climate, Net Zero, News, Politics, Renewables, Solar, WindBy CleanEarth Energy21st February 2020

Trends, events and developments in the UK energy sector.

New CleanEarth turbines in Wales and Scotland

News, Renewables, WindBy CleanEarth Energy20th February 2020

We have three very different wind projects in development, in south Wales and in opposite corners of Scotland. Two are brand new turbines while the third is bringing into commission two turbines that were erected in 2016 but never connected to the grid by the original developer. In total, they will add 8 MW of…

Video: CleanEarth wind turbine installation for Accolade Wines

Renewables, Video, WindBy CleanEarth Energy23rd May 2019

 We made this film of the wind turbine’s final assembly at Accolade Wines’ HQ in Avonmouth over the weekend of 11/12 May. Great credit goes to all of our partners in this venture. After nearly three years of planning and preparation, the last couple of days went without a hitch.    

CleanEarth wind turbine in Accolade Park

‘A first of its kind’ for UK business: CleanEarth wind turbine for Accolade Wines

News, Renewables, WindBy CleanEarth Energy22nd May 2019

At CleanEarth we are always delighted when a major wind turbine project comes to fruition, but this one has particular significance because it sets an important precedent for UK businesses. Our 2.5 MW wind turbine at Accolade Wines’ Avonmouth distribution centre is the first to be constructed for a business that does not own the…

12
Copyright 2018 CleanEarth Energy Ltd. All rights reserved.
Registered in England No. 7225190. Unit 2A, Bess Park Road, Trenant Industrial Estate, Wadebridge.
Website designed and developed by Chalk and Ward
  • Privacy Policy
Bottom Menu
Go to Top