Longstone, St Mewan, Cornwall
Installation Type: Single Wind Turbine
Installation Size: 4.1 MW
Related Info:
CleanEarth are proposing to erect a single 135m wind turbine on land at Longstone, St Mewan, Cornwall.
The proposed site is within the Imerys China Clay Area, an industrialised area of past and current mining activity – currently utilised for wind development, with four existing turbines erected in close proximity to the proposed site. Given the location of the Longstone turbine within the mining landscape, close to existing operational wind turbines and away from residential settlements, the incremental landscape and visual impact is minimal.
The Longstone turbine is expected to have an annual generation of over 12 GWh – the equivalent of powering over 2,350 Cornish homes* – and will save 3,218 tonnes of carbon each year, making a significant contribution to Cornwall Council’s vital carbon reduction targets.
The Longstone turbine will be placed within the St Mewan Parish and will provide a £12,500 direct annual community benefit to the Parish.
As part of the planning process, CleanEarth are holding a public consultation event on Thursday 3rd September 2020, between 2pm and 7pm, at Trewoon Village Hall, Hembal Rd, Trewoon, St Austell, PL25 5SA.
To comply with social distancing guidance, all attendees must book a time slot prior to the event if they wish to attend, either by phone on 0800 975 5635 or using the contact form below.
Alternatively, comments can be submitted via the online questionnaire. The planning statement and all the relevant reports can be downloaded from the links below.
PUBLIC CONSULTATION QUESTIONNAIRE
Longstone Non-Technical Summary
Longstone Planning Statement – PC
Longstone Appendix A – Screening Response
Longstone Appendix B – Location Plan
Longstone Appendix D – LVIA
Longstone Appendix D – LVIA Figures 1-7
Longstone Appendix D – LVIA Figures 8-11
Longstone Appendix D – LVIA Figures 12-17
Longstone Appendix D – LVIA Figures 18-22
Longstone Appendix E – Bat Assessment
Longstone Appendix E – Ornithology Report
Longstone Appendix E – Preliminary Ecological Appraisal
Longstone Appendix F – Heritage Impact Assessment
Longstone Appendix G – Noise Impact Assessment
Longstone Appendix H – Flood Risk Assessment
Longstone Appendix K – Construction Transport Management Plan
Longstone Appendix A – CTMP Survey
Longstone Appendix I – Shadow Flicker Report
Longstone Appendix M – Cyrrus Aviation Report
Longstone Appendix M – Wind Business Aviation Impact Review
For any other enquiries relating to the Longstone turbine, please email us at longstoneturbine@cleanearthenergy.com, call us on 0800 975 5635, or use the form below.
*BEIS: Sub-national electricity consumption statistics 2018 (updated 19 December 2019)