Public Consultation

North Court Farm

Annual output

8.0

GWh

Annual carbon saving

1,700

tonnes

Lifetime carbon saving

59,500

tonnes

North Court Farm, Monmouthshire

Installation Type: Single Wind Turbine

Installation Size: 3.6 MW


CleanEarth are proposing to develop a single wind turbine, with a tip height of up to 150m, on land at North Court Farm, Redwick, Caldicot, Monmouthshire.

The proposed site falls within the Magor with Undy community council and will provide a community benefit fund for the local community.

The proposal has an estimated annual energy yield of 8.0 GWh; the equivalent of powering 2,400 homes in Monmouthshire. The project will save in excess of 1,700 tonnes of carbon annually with a predicted lifetime saving of almost 59,500 tonnes – making a significant contribution to Wales’s target of 70% of energy consumption being delivered through renewable sources by 2030.

A virtual public consultation event was held on Thursday 9th March 2023.

Any enquiries can be made by phone on 01208 895576, or by email to northcourt.project@cleanearthenergy.com.

Further details can be found under reference DM/2023/01045 on the Monmouthshire planning portal.