Higher Goonamarth 2, St Austell, Cornwall
Installation type: Single wind turbine
Installation size: 4.3 MW
CleanEarth are proposing a single wind turbine on land at Higher Goonamarth, on Imerys land in Cornwall.
The proposed Higher Goonamarth 2 turbine is expected to have an annual generation of over 13 GWh, sufficient to power over 3,000 Cornish homes. The carbon savings of the project are just over 2,500 tonnes of carbon annually with a predicted lifetime saving of nearly 100,000 tonnes – making a significant contribution to Cornwall’s carbon reduction targets in the pursuit of carbon neutrality by 2030.
The proposed site falls within the northern fringes of the St Mewan Parish. The project will direct an annual contribution fund to aid local projects and causes in the community.
A public consultation will be held on Wednesday 15 November 2023 from 3pm to 7pm in the atrium at Wheal Martyn Clay Works Museum. Please note this is an open event with no appointment required. However registering your interest prior to the event is encouraged, via phone on 01208 895576 (ext 308) or by email.
The planning statement and supporting information will be published below. Comments can be submitted through an online questionnaire that will be available during the event and for 28 days afterwards.
Any further enquiries can be sent to goonamarth2@cleanearthenergy.com or by using the form below.
Appendix A – Screening & Pre-app:
Cornwall Council Screening Opinion
Appendix B – Site Plans:
Block Plan
Entrance Plan
Location Plan
Appendix D – Landscape & Visual Impact Assessment:
LVIA
Fig 1 – Location Plan
Fig 2 – Site Analysis
Fig 3 – Cumulative Wind Energy Schemes
Fig 4 – Landscape Relevant Designations
Fig 5 – National Landcape Character
Fig 6 – Landscape Character
Fig 7 – Principal Visual Amenity Receptors
Fig 8 – ZTV to Hub (30km)
Fig 9 – ZTV to Blade Tip (30km)
Fig 10 – ZTV to Hub (10km)
Fig 11 – ZTV to Tip (10km)
Fig 12A-D – Viewpoint 1
Fig 13A-D – Viewpoint 2
Fig 14A-D – Viewpoint 3
Fig 15A-D – Viewpoint 4
Fig 16A-D – Viewpoint 5
Fig 17A-D – Viewpoint 6
Fig 18A-D – Viewpoint 7
Fig 19A-D – Viewpoint 8
Fig 20A-D – Viewpoint 9
Fig 21A-D – Viewpoint 10
Fig 22A-D – Viewpoint 11
Appendix E – Ecology:
Ecological Impact Assessment
Biodiversity Net Gain Report
Breeding Bird Report
Bats Report
Appendix F – Heritage Impact Assessment:
Heritage Impact Assessment
Appendix G – Noise:
Noise Report
Appendix H – Hydrology:
Flood Risk Assessment
Appendix J – Shadow Flicker:
Shadow Flicker Report
Appendix K – Construction Transport Management Plan:
CTMP Report
Appendix M – Aviation:
Aviation Supporting Statement
Appendix N – Contamination:
Contamination Land Risk Assessment