To note: The picture above features only the three consented Low Drumclog wind turbines.
The Proposed Project:
CleanEarth are proposing a single wind turbine and 16MW Battery Energy Storage System (BESS) extension together with associated infrastructure at the consented Low Drumclog Wind Farm (P/22/0228).
The proposed turbine would have a maximum tip height of 180m and a generating capacity up to 7MW, in line with the consented development.
The Site:
The development site is located at the consented Low Drumclog Wind Farm (P/22/0228). Consent was granted for 3 turbines up to 180m tip height, in October 2024. The site is approximately 1km northwest of the A71, and 7km southwest of Strathaven.
The proposed extension will utilise the consented infrastructure as much as possible, including but not limited to the site entrance off the A71, approximately 2.5km of access track, underground cabling, and the construction compound.
Public Consultation Events
There will be two in-person public consultation events. Additionally, an online event will be held for any interested parties unable to attend an in-person event. The dates are as follows:
- In-Person Event 1: Wednesday 25th November 2026, between 2pm and 6pm.
- Virtual Event: Wednesday 2nd December 2026, between 2pm and 6pm
- In-Person Event 2: Thursday 10th December 2026, between 2pm and 6pm.
Both in-person events will take place at the Strathaven Hotel, Hamilton Road, Strathaven, Lanarkshire, ML10 6NY.
Further information and Questions
Prior to the first event further details of the proposed development and all of the consultation materials will be made available on this webpage.
If you have any questions, please use the contact details below. Our phone lines are open Monday to Friday, 9am–5pm, and emails are monitored regularly.
- Email: planning@cleanearthenergy.com
- Telephone: 01208 895576
Further information regarding this project will be shared here on this page as it develops.