Bears Down

Bears Down

Bears Down Wind Farm Installation type: Wind Farm repowering Installation size: 18 MW September 2025: CleanEarth have formally requested to modify the planning application for the repowering of Bears Down Wind Farm (PA23/10324). The request seeks to reduce the number of proposed wind turbines from five to four – with the specific removal of Turbine … Read more

Burngullow

Burngullow

Burngullow, Cornwall Installation Type: Single wind turbine Installation Size: 4.1 MW CleanEarth are proposing a single wind turbine up to 135m in height, with associated infrastructure and access track, located within the China Clay area in St Austell, Cornwall. The proposed Burngullow turbine is located within an industrial area that has been influenced by mining … Read more

Crutherland Farm B.E.S.S.

Crutherland Farm B.E.S.S.

Crutherland Farm B.E.S.S. East Kilbride Installation type: Battery Energy Storage System Size: 22.8 MW CleanEarth are proposing a Battery Energy Storage System (BESS) on land at Crutherland Farm, East Kilbride. Battery storage is a technology that enables energy to be stored for later use. The storage system charges from excess grid energy and discharges at … Read more

Dubbers

Dubbers Proposed Wind Turbines

Dubbers Wind Turbines Installation type: Two wind turbines Installation size: 8.6MW November 2025: CleanEarth are proposing two wind turbines on land at Dubbers China-Clay Works, Nanpean, St. Stephen-in-Brannel, PL26 8XT. The proposed Dubbers turbines are expected to have an annual generation of over 25GWh, producing sufficient energy to power over 5,500 Cornish homes. The carbon … Read more

East Merkland

East Merkland

East Merkland, South Lanarkshire Installation type: Wind Farm Installation size: 13.5 MW CleanEarth are proposing three wind turbines on Land at East Merkland, Strathaven, Lanarkshire, ML10 6RP. The proposal has an estimated annual energy yield of approximately 44 GWh, the equivalent of powering over 12,000 South Lanarkshire homes. The project will save more than 9,400 … Read more

Hedley Hope

Hedley Hope

Land at Hedley Hope, County Durham Installation type: wind farm re-powering Installation size: 31.5 MW CleanEarth are proposing to re-power six existing wind turbines on Land at Hedley Hope, Tow Law, Bishop Auckland, County Durham, with seven new, modern wind turbines, with a tip height of up to 149.9m. The proposal has an estimated annual … Read more

Higher Biscovillack

Higher Biscovillack Proposed Wind Turbine

Higher Biscovillack turbine Installation type: Single turbine Installation size: 4.3MW November 2025: In response to the declaration of a ‘Climate Emergency’ by Cornwall Council on 22nd January 2019, CleanEarth have formally proposed a single wind turbine, up to 135m to tip, on land at Higher Biscovillack Farm, Cornwall in the China Clay area. The proposed … Read more

Higher Goonamarth 2

Higher Goonamarth 2

Higher Goonamarth 2, Cornwall Installation type: Single wind turbine Installation size: 4.3 MW CleanEarth are proposing a single wind turbine on land at Higher Goonamarth, on Imerys land in Cornwall. The proposed Higher Goonamarth 2 turbine is expected to have an annual generation of over 13 GWh, sufficient to power over 3,000 Cornish homes. The … Read more

South Brownhill

South Brownhill

South Brownhill, South Lanarkshire Installation type: Windfarm Installation size: 18.6 MW CleanEarth are proposing three wind turbines on Land at South Brownhill, Strathaven, Lanarkshire, ML10 6QP. The proposal has an estimated annual energy yield of approximately 56GWh, the equivalent of powering over 15,500 South Lanarkshire homes. The project will save more than 11,500 metric tonnes … Read more

West Dykehead

West Dykehead

West Dykehead, South Lanarkshire Installation Type: Two wind turbines Installation Size: 7.6 MW CleanEarth are proposing to develop two wind turbines, with a tip height of up to 149.9m, on land at West Dykehead, South Lanarkshire. The proposal has an estimated annual energy yield of 26 GWh; the equivalent of powering 6,700 homes in South … Read more

Tacher Wind Farm Deliveries

Tacher Wind Farm project from above, showing all three turbine locations on site

The Tacher Wind Farm construction site is located on the A9 at Latheron. Deliveries are expected to start on 09 June from Wick Harbour and estimated to end by 12 June. There will be parking restrictions along Martha Terrace and River Street in Wick during delivery windows, which will be marked out with cones from … Read more